Here is an overview of what we consider to be the key website statistics and information:
Parameter name | Status | Comment |
---|---|---|
Website meta title | Paul Revere Williams Project | Search engines recommend title length of around 50-60 characters. The length of this title is 28. |
Meta description | A description has not been provided for this site. | To make sure all the meta description is visible in search results page, Google recommends length of up to 320 characters at the most. This description has exactly 50 characters. |
Load time | 0.95 seconds on average | Website load speed is pretty fast. |
Alexa global | 994 637, as last updated | According to Alexa, the website's popularity is not exactly high. Take this rank with a healthy pinch of salt. |
Quantcast global | 976 492 | The website's rank is quite poor. As with Alexa, QUANTCAST is not always perfectly representative of a website's performance. |
Total links on homepage | We found 21 links | This is a normal amount of links. |
Number of backlinks | Around 113 | Backlinks is one of the key metrics for search engines. This website seems to have a very low number of backlinks, which means poorer rank in search results. |
Page HTML size | 14.4KB | Load speed (and overall responsiveness) is such an important factor for both search engines and user experience, would you not agree? With that in mind, this is a very good result. |
Website server | Server appears to be online. The IP address for the server is 74.205.120.254. | It's unfortunate, but despite our best attempts, we failed to gather enough data to provide a meaningful insight at this time. |
What, all that information was not enough? You want... more? Right, then. You asked for it.
As we've mentioned before, traffic is not a key metric. However, the target audience does say a lot about what's been done to optimize the website, as well as what should be done going forwards. Let's see if we have any useful information here.
Parameter name | Status | Comment |
---|---|---|
Related websites | thenativelatourist.com founderslosangeles.org laconservancy.org neonmuseum.org lainsidertours.com |
These are the websites that fall into the same category as paulrwilliamsproject.org, and so target the same audience and, likely, keywords. To a larger or smaller extent, all of them are competitors. |
Absolute accuracy is accessible only by the webmasters. If you keep that in mind, perhaps you will find out approximate numbers of some use.
Where appropriate, we'll add an insight, but the numbers themselves speak clearly enough, eh?
Parameter name | Status | Comment |
---|---|---|
Time spent on site | 0:31 | We'd argue that average visit time should be improved. The best way to do it, we think, is by providing capticating quality content. |
With over 4 million websites indexed (which can seem as a lot, or very little, depending on your point of view), Alexa is perhaps the oldest and certainly the best known ranking system, deservedly or not. The Alexa Global and Local ranks of a website are based on an approximate amount of visitors a given website receives. The more visitors, the higher the rank. The Alexa rank, be it Local or Global, should be taken with a pinch of salt. After all, visitor count is by far not the simple measure of a website's success it's made out to be. For example, a gardening website is never going to be as popular as a movie review website. It does not mean it's not popular within it's niche.
QUANTCAST - an advertising-related data processing company - mostly specializes in real-time audience analysis and measurements. In other words it, like Alexa, is basing its rankings on approximate traffic numbers. Currently, QUANTCAST has rated around 162 659 459 websites. Just like ALEXA, this is not a metric of huge importance, so don't base your SEO decisions on QUANTCAST rank, specifically. At best, it's a vague representation of how your website is doing in the grand scheme of things, but it does not take all that much context into account.
Similarly to how a hard drive or a modern SSD device holds your files, a server holds all the files the website needs to operate. To load a webpage, your browser needs to contact the said server and request files - strings of code that make up the website into what it is, including images, text and database entries. Each physical server has a unique IP address that is used by the browser to contact it.
Let's see what technical information we've managed to gather:
Header in detail |
---|
HTTP/1.1 200 OK Date: Fri, 28 Apr 2017 19:12:43 GMT Server: Apache/2.2.3 (Red Hat) X-Powered-By: PHP/5.2.17 Set-Cookie: PHPSESSID=gqis6jfudtvk07mrqhoknv5q15; path=/ Expires: Thu, 19 Nov 1981 08:52:00 GMT Cache-Control: no-store, no-cache, must-revalidate, post-check=0, pre-check=0 Pragma: no-cache Vary: Accept-Encoding Connection: close Transfer-Encoding: chunked Content-Type: text/html; charset=UTF-8 |
WHOIS information |
---|
Domain Name: PAULRWILLIAMSPROJECT.ORG Registry Domain ID: D154924196-LROR Registrar WHOIS Server: Registrar URL: http://www.godaddy.com Updated Date: 2016-12-18T14:37:33Z Creation Date: 2008-12-17T20:22:02Z Registry Expiry Date: 2018-12-17T20:22:02Z Registrar Registration Expiration Date: Registrar: GoDaddy.com, LLC Registrar IANA ID: 146 Registrar Abuse Contact Email: Registrar Abuse Contact Phone: Reseller: Domain Status: clientDeleteProhibited https://icann.org/epp#clientDeleteProhibited Domain Status: clientRenewProhibited https://icann.org/epp#clientRenewProhibited Domain Status: clientTransferProhibited https://icann.org/epp#clientTransferProhibited Domain Status: clientUpdateProhibited https://icann.org/epp#clientUpdateProhibited Registry Registrant ID: C80374413-LROR Registrant Name: Reuben Brunson Registrant Organization: RocketFuel Registrant Street: 80 Monroe Ave Registrant Street: Ste 610 Registrant City: Memphis Registrant State/Province: Tennessee Registrant Postal Code: 38103 Registrant Country: US Registrant Phone: +1.9015220205 Registrant Phone Ext: Registrant Fax: Registrant Fax Ext: Registrant Email: Registry Admin ID: C80374415-LROR Admin Name: Reuben Brunson Admin Organization: RocketFuel Admin Street: 80 Monroe Ave Admin Street: Ste 610 Admin City: Memphis Admin State/Province: Tennessee Admin Postal Code: 38103 Admin Country: US Admin Phone: +1.9015220205 Admin Phone Ext: Admin Fax: Admin Fax Ext: Admin Email: Registry Tech ID: C80374414-LROR Tech Name: Reuben Brunson Tech Organization: RocketFuel Tech Street: 80 Monroe Ave Tech Street: Ste 610 Tech City: Memphis Tech State/Province: Tennessee Tech Postal Code: 38103 Tech Country: US Tech Phone: +1.9015220205 Tech Phone Ext: Tech Fax: Tech Fax Ext: Tech Email: Name Server: NS61.DOMAINCONTROL.COM Name Server: NS62.DOMAINCONTROL.COM DNSSEC: unsigned URL of the ICANN Whois Inaccuracy Complaint Form: https://www.icann.org/wicf/ >>> Last update of WHOIS database: 2017-08-04T04:51:02Z <<< For more information on Whois status codes, please visit https://icann.org/epp Access to Public Interest Registry WHOIS information is provided to assist persons in determining the contents of a domain name registration record in the Public Interest Registry registry database. The data in this record is provided by Public Interest Registry for informational purposes only, and Public Interest Registry does not guarantee its accuracy. This service is intended only for query-based access. You agree that you will use this data only for lawful purposes and that, under no circumstances will you use this data to: (a) allow, enable, or otherwise support the transmission by e-mail, telephone, or facsimile of mass unsolicited, commercial advertising or solicitations to entities other than the data recipient's own existing customers; or (b) enable high volume, automated, electronic processes that send queries or data to the systems of Registry Operator, a Registrar, or Afilias except as reasonably necessary to register domain names or modify existing registrations. All rights reserved. Public Interest Registry reserves the right to modify these terms at any time. By submitting this query, you agree to abide by this policy. |
A good domain address is usually one that is easy to spell, resulting in the smallest amount of mistypes possible. Still, such a thing inevitably happens. Here is a list with the most frequent 1855 mistypes, associated with paulrwilliamsproject.org:
If you are curious about what TLD extensions could also match the domain name of paulrwilliamsproject.org well, we have prepared an extensive list for you to look through:
We are glad you have finished this report. Hopefully, you found what you were looking for. In case you need more information to compare, here is a list of some other detailed overviews we have prepared: