Here is an overview of what we consider to be the key website statistics and information:
Parameter name | Status | Comment |
---|---|---|
Website meta title | MS Project For Mac | Search engines recommend title length of around 50-60 characters. The length of this title is 18. |
Meta description | A description has not been provided for this site. | To make sure all the meta description is visible in search results page, Google recommends length of up to 320 characters at the most. This description has exactly 50 characters. |
Load time | 1.9733 seconds on average | Load speed is a concern and should be improved if and when possible. |
Number of backlinks | Around 7 | Backlinks is one of the key metrics for search engines. This website seems to have a very low number of backlinks, which means poorer rank in search results. |
Page HTML size | 18.7KB | How do we put this... improvement is quite necessary. Load speed is a very important factor in so many ways! |
Website server | Server appears to be online. The IP address for the server is 107.172.4.185. | It's unfortunate, but despite our best attempts, we failed to gather enough data to provide a meaningful insight at this time. |
What, all that information was not enough? You want... more? Right, then. You asked for it.
As we've mentioned before, traffic is not a key metric. However, the target audience does say a lot about what's been done to optimize the website, as well as what should be done going forwards. Let's see if we have any useful information here.
Parameter name | Status | Comment |
---|---|---|
Related websites | 3rdsectorskills.com macitfaster.com itaskx.com microsoftproject-online.com planningproapp.com |
These are the websites that fall into the same category as msprojectformac.org, and so target the same audience and, likely, keywords. To a larger or smaller extent, all of them are competitors. |
Similarly to how a hard drive or a modern SSD device holds your files, a server holds all the files the website needs to operate. To load a webpage, your browser needs to contact the said server and request files - strings of code that make up the website into what it is, including images, text and database entries. Each physical server has a unique IP address that is used by the browser to contact it.
Let's see what technical information we've managed to gather:
Header in detail |
---|
HTTP/1.1 200 OK Server: nginx Date: Tue, 12 Sep 2017 19:03:50 GMT Content-Type: text/html; charset=UTF-8 Content-Length: 19109 Connection: keep-alive Vary: Accept-Encoding Last-Modified: Tue, 12 Sep 2017 18:28:34 GMT ETag: "4aa5-55902360928b2" Cache-Control: max-age=3600, public Expires: Tue, 12 Sep 2017 20:03:50 GMT Vary: Accept-Encoding,User-Agent Pragma: public X-XSS-Protection: 1; mode=block X-Content-Type-Options: nosniff X-Nginx-Cache-Status: MISS X-Server-Powered-By: Servikus Accept-Ranges: bytes |
A good domain address is usually one that is easy to spell, resulting in the smallest amount of mistypes possible. Still, such a thing inevitably happens. Here is a list with the most frequent 1758 mistypes, associated with msprojectformac.org:
If you are curious about what TLD extensions could also match the domain name of msprojectformac.org well, we have prepared an extensive list for you to look through:
We are glad you have finished this report. Hopefully, you found what you were looking for. In case you need more information to compare, here is a list of some other detailed overviews we have prepared: